Project timeline in LeadsMate Contracts & Projects

See every project phase in a visual timeline, from design review through procurement to final handover, so you can plan work and keep everyone aligned.

What it is

The Project timeline in LeadsMate Contracts & Projects gives you a visual view of the phases that make up a project. It helps you understand the path from early design review through procurement, delivery and final handover, rather than treating each stage as an isolated piece of work.

For prospective customers, the value is straightforward: a timeline makes the project plan easier to explain and discuss. It provides a shared reference for conversations about what happens next, when each phase should take place and where a delay could affect later work.

How it works step by step

Step 1: Define the project journey. Start by identifying the main phases required to deliver the contracted work. Depending on your business, these might include design review, client approval, procurement, site preparation, installation, inspection and handover. Use names that your team and customer will recognise.

Step 2: Establish the planned timing. Agree when each phase should begin and finish, using the contract commitments and delivery requirements as your starting point. Distinguish confirmed dates from working assumptions in your planning discussions, especially where approval dates or supplier lead times remain uncertain.

Step 3: Consider the order of work. Review which phases must finish before another can begin and which can run alongside one another. For example, procurement may need to wait for design approval, while some preparation work may be possible earlier. This review helps you build a realistic sequence without assuming that every phase happens one after another.

Step 4: Use the visual timeline to review the whole plan. Look across the project from start to finish and check whether the timing makes business sense. Discuss any crowded periods, gaps or tight transitions with the people responsible for delivery before treating the plan as agreed.

Step 5: Revisit the timeline as work progresses. Compare the current project position with the planned phases during regular reviews. If a decision, delivery or completion date changes, assess what that means for the remaining work and agree any necessary revisions with the relevant stakeholders.

Step 6: Review the path to handover. As delivery nears completion, check that the plan allows time for inspections, outstanding work, documentation and customer acceptance where required. Treat handover as a planned phase, not simply the date when physical work ends.

A typical example

Consider a commercial refurbishment project. The team begins with design review and customer approval, followed by procurement of materials and equipment. Site preparation and installation then lead into inspection and final handover.

If design approval takes longer than expected, the timeline provides a useful basis for discussing the impact. The team can consider whether procurement must move, whether any preparation can proceed and whether the intended handover date remains realistic. It supports that conversation without replacing the need to confirm supplier availability or obtain customer agreement.

Tips for getting the most out of it

Keep the main phases clear enough for a customer or manager to understand at a glance. Too much detail can make a timeline harder to use, while too little can hide important approval points or delivery constraints.

Agree who is responsible for reviewing the plan and how often those reviews should happen. Use consistent phase names and check timing assumptions whenever the project scope changes. A timeline is most useful when it reflects an actively managed plan rather than an initial schedule that nobody revisits.

Related

Consider the Project timeline alongside your contract scope, approval process, procurement planning and handover requirements. Together, these provide the context needed to turn a visual sequence of phases into a practical delivery plan.

Discuss the proposed workflow